期刊文献+

红庆梁煤矿巷道过断层破碎带施工 被引量:3

Construction of Mine Roadway Passed through Broken Zone of Fault in Hongqingliang Mine
下载PDF
导出
摘要 红庆梁煤矿3-1煤层回风大巷过DF14断层破碎带施工中,根据该断层破碎带构造特征,并考虑经济合理性和施工安全性,决定掘进绕道,垂直通过该断层;过断层之前,采用塑性早强复合注浆材料和水泥-水玻璃双液浆,对断层破碎带进行注浆加固,预留止浆岩柱。方案实施后,收到了预期效果,为类似条件下的巷道施工提供了经验。 In a construction of an air returning roadway in No. 3-1 seam passed through a broken zone of DF14 fault in Hongqingliang Mine,according to the structure features of the broken zone in the fault and in consideration of the economic rationality and construction safety, a detour heading was determined and the driving was vertically passed through the fault. Before the detour passed through the fault, the plastic early strength complex grout material and the cement-sodium silicate double liquid grout were applied to the grouting reinforcement of the broken zone in the fault and the grouting rock pillar was pre-left. After the plan conducted,the schedule effect was reached and could provide the experiences to the construction of the mine roadway under the similar condition.
作者 王苏龙 张天仓 WANG Su-long ZHANG Tian-cang(Tiandi Science and Technology Company Limited ,Beijing 100013,China Preparatory Office ,Fanwangsi Mine Company Limited, Datong Coal Mine Group Corporation Limited, Shuozhou 036002 ,China)
出处 《建井技术》 2016年第6期19-21,共3页 Mine Construction Technology
关键词 巷道 断层破碎带 绕道 止浆岩柱 注浆加固 mine roadway broken zone of fault detour grouting rock pillar grouting reinforcement
  • 相关文献

参考文献6

二级参考文献40

共引文献187

同被引文献28

引证文献3

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部