期刊文献+

接缝水泥混凝土路面错台模型对比分析 被引量:2

Comparative analysis of jointed plain concrete pavement faulting model
下载PDF
导出
摘要 在分析水泥混凝土路面接缝错台产生机理的基础上,对国外八大横向接缝错台预估模型进行对比研究。结果表明:接缝错台变化随着时间的推移增幅逐渐减小,最后趋于平缓;板底支承变形能量、基层和路基的侵蚀指数以及自由水指数是所有模型均考虑的影响因素;设传力杆能显著减小接缝错台量;路肩类型也是影响接缝错台变化的重要因素。最后给出了对应的降低接缝错台量的措施。 Based on the mechanism analysis of joint faulting of cement concrete pavement,this paper studies comparatively the eight foreign prediction model of joint faulting in the world.The result shows that the growth rate of joint faulting decreases as the time goes on,and the final leveling is off.The bottom bearing deformation energy,the erosion index of base and subgrade,and the free water index are the influential factors to be considered.The dowel bar will significantly reduce the joint faulting.And the shoulder type is also the important factor that affects joint changes.Finally,the corresponding measures to reduce the joint faulting are given.
作者 李晶晶 王占锋 LI Jingjing WANG Zhanfeng(School of Highway and Railway Engineering, Shaanxi College of Communication Technology, Xi'an 710018, China School of Highway, Chang'an University, Xi'an 710064, China School of Civil and Geodesy Engineering,Shaanxi College of Communication Technology, Xi' an 710018, China)
出处 《交通科技与经济》 2017年第1期54-58,共5页 Technology & Economy in Areas of Communications
基金 浙江省交通运输厅科研计划项目(2014H38) 陕西省教育科学十二五规划项目(SGH140930)
关键词 道路工程 水泥混凝土路面 错台 预估模型 措施 road engineering cement concrete pavement faulting prediction model measure
  • 相关文献

参考文献1

二级参考文献16

  • 1唐伯明,姚祖康,夏瑞莲,宋三元.水泥混凝土路面长期结构性能监测评价[J].中国公路学报,1996,9(2):20-27. 被引量:15
  • 2周文献,施小忠,施祖兴,孙立军.水泥混凝土路面调查及网级使用性能预测模型[J].同济大学学报(自然科学版),2006,34(5):624-628. 被引量:9
  • 3Gary E Elkins, Peter Schmalzer, Travis Thompson, et al. Long- term pavement performance information manage-ment system: pavement performance database user reference guide [ R]. Washington,DC: Federal Highway Administration, 2004.
  • 4US Department of Transportation. LTPP 2004 year in review [R]. Washington, DC: Federal Highway Administration, 2005.
  • 5Simpson A L,Rauhut J B,JordahlP R, et al. Early analysis of LTPP general pavement studies data, volume III: sensitivity analyses for selected pavement distresses[R]. Washington, DC: Strategic Highway Research Program, 1994.
  • 6Yu H T,Smith K D,Darter M I,et al. Performance of concrete pavements, volume III: improving concrete pavement performance [ R]. Washington, DC: Federal Highway Administra tion, 1997.
  • 7Wu C L,Mack J W,Okamoto P A,et al. Prediction of faulting of joints in concrete pavements, volume 2[C]//Proceedings of the International Conference on Concrete Pavement Design. Lafayette: Purdue University, 1993: 53 - 70.
  • 8Owusu-AntwiEB,Titus-Glover L, Khazanovich L, et al. Development and calibration of mechanistic-empirical distress models for cost allocation(final report) [R]. Washington, DC: Federal Highway Administration, 1997.
  • 9Titus-Glover L,Owusu-Antwi E B, Darter M I. Design and construction of pcc pavements volumn 3: improved PCC performance models [ R]. Washington, DC: Federal Highway Administration, 1999.
  • 10Yu H T, Khazanovich L, Rao S P,et al. Guidelines for subsurface drainage based on performance [R]. Washington, DC:National Cooperative Highway Research Program, 1998.

共引文献6

同被引文献6

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部