期刊文献+

Development of a six drillhead roof bolting machine 被引量:1

Development of a six drillhead roof bolting machine
下载PDF
导出
摘要 In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design and manufacture a new roof bolting machine with six independent drilling apparatus on board capable of drilling and bolting the roof and ribs with material handling. The objective was to produce a machine capable of drilling and installing six bolts simultaneously with a limited number of operators. The goal of the mine is to decrease the time to bolt a cut to improve the safety level of the current roof bolting method, improve efficiency and to improve the bottom line cost of entry development. The customer wanted four drills at the front of the machine dedicated to installing roof bolts and then another two drills behind them dedicated to rib bolts. This dictated the requirement of latched controls, which would allow the operator to start drilling one hole and then latch the controls to be able to move on to the next.The result of the design is a machine with a single platform and six independent masts with drillheads:four masts strictly for drilling and installing roof bolts on the front of the platform and two masts on the back of the platform for rib bolts. The controls at each operator's station include a latch control for drilling. The six-head roof bolter allows fewer operators to drill and install roof and rib bolts, which in turn lowers the miners' roof exposure per cut. This design reduces the operator's exposure from the inherent pinch points and rotary hazards once he has engaged the latch drilling. Therefore, the machine will help to decrease the time to bolt a cut, improving productivity while enhancing the ability to operate the machine safely. In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design and manufacture a new roof bolting machine with six independent drilling apparatus on board capable of drilling and bolting the roof and ribs with material handling, The objective was to produce a machine capable of drilling and installing six bolts simultaneously with a limited number of operators. The goal of the mine is to decrease the time to bolt a cut to improve the safety level of the current roof bolting method, improve efficiency and to improve the bottom line cost of entry development. The customer wanted four drills at the front of the machine dedicated to installing roof bolts and then another two drills behind them dedicated to rib bolts. This dictated the requirement of latched controls, which would allow the operator to start drilling one hole and then latch the controls to be able to move on to the next, The result of the design is a machine with a single platform and six independent masts with drillheads: four masts strictly for drilling and installing roof bolts on the front of the platform and two masts on the back of the platform for rib bolts. The controls at each operator's station include a latch control for dril- ling. The six-head roof bolter allows fewer operators to drill and install roof and rib bolts, which in turn lowers the miners' roof exposure per cut. This design reduces the operator's exposure from the inherent pinch points and rotary hazards once he has engaged the latch drilling. Therefore, the machine will help to decrease the time to bolt a cut, improving productivity while enhancing the ability to operate the machine safely.
机构地区 J.H.Fletcher&Co.
出处 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第1期37-41,共5页 矿业科学技术学报(英文版)
关键词 Roof bolter MiningSix-head FletcherLatched Material handling 锚杆机 顶板 钻机 机械设计 钻井平台 切割时间 机器安全 锁存器
  • 相关文献

同被引文献15

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部