摘要
针对传统的浮式驳船搭载振冲设备在强浪条件作用下难以保证碎石桩施工的精度和进度要求等问题,依托在建的以色列阿什杜德港项目,对如何有效克服强浪条件影响实现大面积海上碎石桩施工的方法进行研究总结,提出以采用顶升式碎石桩施工专用平台和碎石输送皮带机系统为核心设备的创新施工工艺。
In view that the traditional construction method of offshore stone column as the floating barge with vibro-equipment can hardly meet the schedule and accuracy requirement, this paper comprehensively studies the solution to achieve extensive offshore stone column construction under strong wave condition,and puts forward the self-elevating platform(jack-up) and conveyor for vibro-stone transportation as an innovative construction technique.
出处
《水运工程》
北大核心
2017年第4期190-194,共5页
Port & Waterway Engineering
关键词
强浪
海上振冲碎石桩
顶升平台
皮带机
strong wave
stone column offshore construction
jacking-up platform
belt conveyor