摘要
电能计量装置安装送电作为业扩报装最后一环,其工作质量好坏直接影响客户对电能的如期使用。因此,电能计量装置验收质量的改善能够提高专变客户现场装表工作效率,缩短业扩报装流程时限,提前为客户送上电,可谓意义重大。结合具体工程实例,从供电方案、图纸审查、现场验收等环节层层把关,重点研究了10kV专变客户电能计量装置竣工报验后,提高现场电能计量装置验收质量的控制方法。
Combined with specific engineering example in this paper,from the power supply scheme,drawings review,on- site inspection and acceptance of link cengcengbaguan,focuses on lOkV electric energy metering device on change of customers after the completion inspection and control method to improve the quality of the acceptance of electric energy metering device.
出处
《工业控制计算机》
2017年第4期134-134,144,共2页
Industrial Control Computer
关键词
电能计量装置
竣工验收
送电
计量柜
electric energy metering device,completion inspection and acceptance,sending,measuring tank