摘要
结合某城市地铁9号线西延线科技城站~红树湾站区间盾构侧穿并上跨既有运营线路11号线的成功经验,对盾构施工过程中的控制措施进行探讨分析,对后续相似工程起到一定的借鉴意义。
Combined with the successful experience of the shield side off and through the existing operating line 11 of a city subway line 9 Science and Technology station to Hongshuwan station of line Xiyan,the control measures of shield construction process are discussed,which can be used as a reference for similar projects.