期刊文献+

大型抽水蓄能电站地下厂房环境测试方案 被引量:5

Environmental measurement scheme of underground powerhouse in large pumped storage power station
下载PDF
导出
摘要 为了评估大型抽水蓄能电站地下厂房温湿度控制的效果,提高运行环境的舒适性及其对机电设备安全性的设计水平,分析了宜兴抽水蓄能电站地下主厂房、母线洞、主变洞、排风道的结构特点,结合地下厂房及主要洞室的通风、内部空气循环以及各自不同的温湿度性能参数分析要求,选用合适的温度、湿度、噪声环境参数测量仪表,分别设计了厂房和不同洞室的通风除湿性能测试方案.经过初步的测试及分析可以得到,选用的测试仪表具有价格适中、精度高和使用方便的特点;制定的测试系统和方案可以全面而系统地测试地下厂房温湿度控制效果.选用的仪器仪表和测试方案结合了厂房和通风空调系统的特点与要求,可以为同类电站通风空调系统测试和性能分析提供参考. In order to evaluate the temperature and humidity control effects in the underground power- houses for a huge pumped storage power station, the design levels of operation environmental comfort were increased and effects on the electromechanical equipment were safe. These were analyzed for the structure characters of the underground main powerhouse, generatrix cavern, main transformer cavern and air exhaust channel from Yixing pumped storage power station. Due to the performance parameters analysis requirements for the ventilation, inner air circulation and the temperature and humidity con- trols for the underground main powerhouses and main caverns, suitable measurement instruments were chosen for the temperature, humidity and noise parameters respectively, and the measurement schemes were also designed. After preliminary measurement and analysis, it is obtained that the measurement instruments chosen in the project are moderate price, high precision and convenient to use, mean- while, measurement system and schemes could be satisfied with the temperature and humidity evalua- tion. Measurement instruments and schemes should be combined with powerhouse structure and air condition system requirements, and this paper can provide references for similar power station ventila- tion and air conditioning system measurement and performance analysis.
出处 《排灌机械工程学报》 EI CSCD 北大核心 2016年第12期1051-1057,共7页 Journal of Drainage and Irrigation Machinery Engineering
基金 国网新源公司科技项目(SGTYHT/15-JS-193) 国家自然科学基金资助项目(51509076) 江苏省自然科学基金资助项目(BK20150816)
关键词 抽水蓄能电站 温湿度测试 通风排热 地下厂房 pumped storage power station temperature and humidity measurement ventilation system underground powerhouse
  • 相关文献

参考文献4

二级参考文献28

  • 1付祥钊.地下水电站的送风方案——模型实验研究[J].土木建筑与环境工程,1992,30(4):102-109. 被引量:3
  • 2付祥钊.水电站地下主厂房顶送风研究[J].暖通空调,1996,26(1):59-62. 被引量:20
  • 3陆耀庆.实用供热空调设计手册[M]2版.北京:中国建筑工业出版社,2008.
  • 4国家电力公司西北勘测设计研究院.DL/T5165-2002水力发电厂厂房采暖通风与空气调节设计规程[S].北京:中国电力出版社,2002.
  • 5唐文华.街面水电站地下厂房通风空调系统设计[G]∥水电暖通空调技术(18),2010:40-42.
  • 6潘佩华.天荒坪地下抽水蓄能电站通风空调介绍[C]∥国内外水电站地下与封闭厂房暖通空调论文专集,1990166-71.
  • 7金峰,吴云翔.丹江口电站空调设计[c]∥国内外水电站地下与封闭厂房暖通空调论文专集,1990s5-13.
  • 8杨虞武,新安江电站空调几个阀题的研究[c]∥国内外水电站地下与封闭厂房暖通空调论文专集,1990:1-4.
  • 9张帆.水口电站通风空调设计[C]∥国内外水电站地下与封闭厂房暖通空调论文专集,1990:22-27.
  • 10赵鸿寿.二滩水电站通风空调设计[c]∥国内外水电站地下与封闭厂房暖通空调论文专集,1990;90-95.

共引文献18

同被引文献56

引证文献5

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部