超长结构后浇带深化设计与加强技术措施 被引量:9

Detailed Design and Strengthening Measures of the Late-poured Band in the Super Long Structure
下载PDF
导出
摘要 以吉林省延吉市某高层框架剪力墙结构工程为例,对高层建筑中超长钢筋混凝土结构的后浇带设计与施工问题进行了探讨,结合设计计算及施工关键控制点,深化了施工工艺流程及加强技术措施。经工程验证,其施工质量符合现行规范验收标准,不仅有效地治理了施工质量通病,而且取得了良好的经济与社会效益。 Taking a high-rise frame-shear wall structure engineering as an example in Yanji, Jilin, this paper discusses the problem about the design and construction of the late-poured band in the super long reinforced concrete structure of the high-rise buildings. Combined with the design calculation and the construction control key points, deepens the construction process and the strengthening technical measures. According to the engineering verification, the construction quality meets the acceptance criteria in the present standard, effectively manages the construction quality problems, also achieves good economic and social benefits.
机构地区 延边大学工学院
出处 《施工技术》 CAS 北大核心 2017年第9期20-23,66,共5页 Construction Technology
基金 延边大学大学生创新创业项目(ydbksky2016003)
关键词 混凝土 后浇带 深化设计 止水钢板 施工缝 加强措施 concrete late-poured band detailed design sealing steel plate constructionjoint strengthening
  • 相关文献

参考文献4

二级参考文献21

共引文献25

同被引文献37

引证文献9

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部