摘要
为达到国家《城镇污水处理厂污染物排放标准》(GB18918—2002)一级A要求,对沈阳市污水处理厂实施提标改造工程。通过对沈阳市城市污水处理厂现状、处理工艺特征及运行情况调研分析,根据沈阳市城市污水处理厂需要提标改造存在的问题,提出工艺优化以及提标改造解决对策,为沈阳市城市污水处理厂提标改造的工程建设提供技术支撑。
Upgrade and reconstruction of the sewage treatment plants in Shenyang was carried out to meet level A of "the Discharge Standard of Pollutants for Urban Wastewater Treatment Plant" (GB18918-2002). According to the existing problems based on the survey analysis of the status, process features and operation of the urban sewage treatment plants in Shenyang, countermeasures for process optimization, upgrade and reconstruction were proposed, providing technical support for engineering construction projects of upgrade and reconstruction of urban sewage treatment plants in Shenyang.
出处
《环境保护科学》
CAS
2017年第2期19-23,共5页
Environmental Protection Science
基金
国家水体污染控制与治理科技重大专项(2012ZX07202-005-003)基金资助
关键词
城市污水处理厂
提标改造
工艺优化
Urban Sewage Treatment Plant
Upgrade and Reconstruction
Process Optimization