摘要 柔性能力是企业应对需求波动风险的重要手段,投资提前期长,属于战略决策。考虑了运作层面的生产成本,研究了柔性能力生产成本与专用能力生产成本不同时柔性能力选择及投资决策,并与两种生产成本相同时的决策进行比较分析。将问题构建为两阶段随机规划模型,最优投资决策满足的条件可由卡罗需-库恩-塔克条件给出,并符合多维报童模型。柔性能力投资策略属于阈值策略,当且仅当柔性能力投资成本低于阈值时,对柔性能力投资是最优的。生产成本相同和不同两种情形相比较,后者的最优决策满足条件需要更多需求区域的划分,柔性能力投资成本阈值低于前者,投资条件变得苛刻。最后,通过数值分析对主要结论进行说明和验证,并分析需求波动风险参数对主要结论的影响。 Investing in flexible capacity is one strategy that provides a hedge against demand uncertainty and it belongs to strategic decisions. In this paper, by assuming the production costs are different, we compare the optimal investment strategy with the one where the production costs are the same, and analyze how the optimal investment strategy is affected by production costs difference. We model the firm's decision problem as a two-stage stochastic programming problem. The optimal solution is obtained by Karush-Kuhn-Tucker condition, and consistent with the solution of multidimensional newsvendor problem. The optimal strategy for investing in flexible capacity is threshold strategy, it is optimal to invest in flexible capacity when investment cost is less than the threshold value. When production costs are different, more demand regions are needed to be divided in the second stage problem, and the threshold value is less than that in the case where production costs are the same. A numerical study is given to
出处 《系统管理学报》 CSSCI CSCD 北大核心 2017年第3期543-550,共8页 Journal of Systems & Management
基金 国家自然科学基金重点项目(70732003) 上海交通大学研究生创新培养专项基金资助项目(Z-120-010)
关键词 能力规划 柔性能力 随机需求 生产成本 capacity planning flexible capacity stochastic demand production cost
  • 相关文献

参考文献2

二级参考文献19

  • 1Kotler P MarketingManagement Analysis Implementation.and Control(Ninth Edition)[M].清华大学出版社,1997..
  • 2[1]Chen Z L,Li S,Tirupati D.A scenario based stochastic programming approach for technology and capacity planning[J].Computers and Operations Research,2002(29):781-806.
  • 3[2]Li S,Tirupati D.Technology choice with stochastic demands and dynamic capacity allocation.A twoproduct analysis[J].Journal of Operations Management,1995(22):239-258.
  • 4[3]EppenG D,Martin R K,Linus S.A scenario approach to capacity planning[J].Operations Research,1989(37):517-527.
  • 5[4]Roth A V,Gaimon C,Krajewski L.Optimal acquisition of FMS technology subject to technological progress[J].Decision Sciences Journal,1991 (22):308-334.
  • 6[5]Rajagopalan S.Capacity expansion and equipment replacement.A unified approach[J].Operations Research,1998 (46):846-857.
  • 7[6]Hua Z S,Banerjee P.Aggregate line capacity design for PWB assembly systems[J].International Journal of Production Research,2000 (38):2417-2441.
  • 8[9] Hua Z S,Huang F H.A variable-grouping based genetic algorithm for large-scale integer programming[J].Information Sciences,2006(176):2869-2885.
  • 9[10] Hua Z S,Huang F H.An effective genetic algorithm approach tO large scale mixed integer programming problems[J].Applied Mathematics and Computation,2006(174):897-909.
  • 10Eppen, G. D, Maritin, R. K. and Schrage, L. A. Scenario Approach to Capacity Planning [ J ]. Operation Research.1989,37(4) :517 - 27.

共引文献8

同被引文献10

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部