期刊文献+

沙沱升船机二期混凝土滑模设计与施工 被引量:2

Design and Construction of Slip Form for the Second Phase Concrete of Shatuo Ship Lift
下载PDF
导出
摘要 沙沱升船机工程中的承船厢室轨道二期混凝土具有高落差、仓面小、对称分布等特点,针对这些特点本工程采用了施工速度快、机械化程度高的滑模施工技术,从滑模施工方案、模体设计、施工工艺等方面详细阐述了滑模施工在沙沱升船机工程中的应用。实践表明,滑模施工对于升船机工程中的承船厢室轨道二期混凝土施工适用性较强,既能节约工期又具有较好的经济效益。 The second phase concrete construction for the pathway of ship chamber in Shatuo ship lift is characterized by high drop, small placement surface and symmetric distribution, so the slip-form construction with fast construction speed and high level of mechanization is adopted in this project. The application of slip-form construction in Shatuo ship lift is elaborated from construction scheme, body design of slip form and construction technology. It is proved by practice that the slip-form construction exerts strong applicability on the second phase concrete construction which not only saves construction period, but also brings enormous economic benefit.
出处 《水力发电》 北大核心 2017年第6期70-75,共6页 Water Power
基金 国家自然科学基金资助项目(51574223)
关键词 升船机 承船厢室轨道 滑模施工 二期混凝土 高落差 沙沱水电站 ship lift pathway of ship chamber slip-form construction second phase concrete high drop Shatuo hydropower Station
  • 相关文献

参考文献4

二级参考文献25

共引文献16

同被引文献13

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部