大断面泥水盾构隧道穿越河流施工技术探讨 被引量:11

Discussion of Construction Techniques for the Slurry Shield-Driven River-Crossing Tunnel with Large-Section
下载PDF
导出
摘要 随着城市交通的快速发展,在长三角等河流众多的区域建设大断面短距离河底隧道的需求急剧增加。采用盾构法在河流下方进行隧道施工时,为了满足线路坡度要求,河底段覆土往往较浅,而且盾构在河流驳岸处推进时,覆土深度变化较大,切口水压较难控制,从而增加了施工风险和施工技术难度,成为影响工程安全的关键问题。文章以江阴澄江西路隧道工程为背景,首先分析了河底浅覆土和河流驳岸处的施工风险;其次,为了降低大直径泥水盾构隧道穿越河流段的施工风险,提出了对闸桥河驳岸边及河底进行加固的技术措施;同时,在盾构掘进过程中选取合适的施工参数并采取相应的施工控制措施,综合采用多种手段为盾构顺利穿越河流段施工提供了有力保障,可为类似工程提供借鉴。 With the rapid development of urban traffic, there are increasing needs for short and large-section traffic tunnels in the Yangtze River delta area with many rivers in China. To meet the slope requirements, the depth of overburden under river is usually small, and the pressure at tunnel face is difficult to be controlled when tunnel crosses under the river revetment where the overburden varies largely, which increases the risks and difficulties of construction and becomes a key issue concerning project safety. Based on the Chengjiangxilu tunnel in Jiangyin, construction risks were analyzed in respects of small overburden and the river revetment; in order to reduce construction risks of the large-diameter slurry shield tunnel crossing river, some construction techniques were proposed for reinforcement of river revetment and riverbed of Zhaqiao River; and appropriate construction parameters were selected and construction control measures were adopted in the process of shield construction.
出处 《现代隧道技术》 EI CSCD 北大核心 2017年第3期169-173,共5页 Modern Tunnelling Technology
基金 国家自然科学基金项目(41372284) 上海市科学技术委员会科研项目(14231200602)
关键词 河底公路隧道 浅覆土 加固措施 参数选取 施工控制措施 River-crossing highway tunnel Shallow overburden Reinforcement measures Parameter selection Construction control measures
  • 相关文献

参考文献9

二级参考文献79

共引文献295

同被引文献94

引证文献11

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部