期刊文献+

基于BIM5D技术施工阶段成本控制模型构建 被引量:7

Construction on cost control model of construction stage based on BIM5D Technology
下载PDF
导出
摘要 基于先进的BIM5D技术,结合挣值法,深刻挖掘BIM5D技术在成本控制中的潜在优势,系统性地分析成本控制模型的系统实施流程,并通过北京某信息大厦成本控制过程论证了基于BIM5D技术施工阶段成本控制模型构建的可行性。 The cost control model can show the change trend of the cost in the construction stage, control costs reasonably, and reduce the cost of construction risk. Based on the advanced BIM5D technology and the earned value method, this paper explores the potential advantages of BIM5D technology deeply in cost control, and analyzes the system implementation process of the cost control model systematically. The feasibility of the construction cost control model based on BIMSD technology is demonstrated through the cost control process of a certain Information Building in Beijing.
出处 《河北工程大学学报(自然科学版)》 CAS 2017年第2期62-65,共4页 Journal of Hebei University of Engineering:Natural Science Edition
基金 国家自然科学基金资助项目(71471072)
关键词 成本控制 建筑信息模型BIM BIM5D挣值法 cost control building information model BIM BIM5D earned value
  • 相关文献

参考文献4

二级参考文献22

  • 1Eastman C, Teicholz guide to building managers, designers 2nd ed. New Jersey: P, Sacks R, etc. BIM handbook: a information modeling for owners, engineers, and contractors [ M ]. John Wiley & Sons, 2011 : 13.
  • 2Lee C, Sacks R, Eastman C. Specifying parametric building object behavior (BOB) for a building information modeling system [Jl. Automation in Construction, 2006, 15 (6): 758-776.
  • 3Patrick C S. Evaluating the impact of building information modeling (BIM) on construction [C- //7th International Conference on Construction Applications of Virtual Reality, 2007: 206-215.
  • 4Smith D K, Tardif M. Building information modeling: a strategic implementation guide for constructors, and real estate asset Jersey: John Wiley & Sons, 2009: managers 115. engineers [M]. New.
  • 5Akinci B, Fischer M, Kunz J. Automated generation of work spaces required by construction activities [ J]. Journal of Construction Engineering and Management, 2002, 128 (4): 306-315.
  • 6Hyun Jeong Choo, Iris D Tommelein, Glenn Ballard, etc. WorkPlan: constraint-based database for work pacakage scheduling [ J]. Journal of Construction Engineering and Management, 1999, 125 (3): 151-160.
  • 7Sriprasert E, Dawood N. Multi-constraintinfor mation management and visualization for collaborative planning and control in construction [ J ]. Electronic Journal of Information Technology in Construction, 2003 ( 8 ): 341-366.
  • 8乐云.项目管理慨论[M].北京:中国建筑工业出版社,2008:204-225.
  • 9Bazjanac. Applying Information Modeling to Buildings[J]. Virtual Building Environments. 2006 ( 10 ): 185-192.
  • 10Han na,Awad S. Using the earned value management system to improve electrical project control [J].Journal of Construction Engi- neering and Management, 138(3):449-457.

共引文献100

同被引文献33

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部