实施桥梁预制拼装施工,通过工厂专业化生产,提高桥梁预制构件的加工精度,作业效率提高21倍;可最大限度节约资源,减少损耗。有效解决城市中心城区狭窄空间内工程施工受到作业空间限制的矛盾,既减少对周边环境的影响,加快进度,又有效降低施工安全风险。
The implementation of the bridge prefabricated construction, through the factory specialized production, the processing accuracy of the bridge prefabricated components is improved and the operating efficiency is increased by 21 times, which can maximize the conservation of resources and reduce losses. It can effectively solve the narrow space construction problem in urban downtown, which not only can reduce the impacts on the surrounding environment, speed up the project progress, but also reduce the construction safety risks effectively.