南昌红谷沉管隧道短管节干坞内拉合对接施工技术 被引量:1

Construction Technology for Short Segment Pulling and Connecting in Dry Dock:A Case Study of Honggu Immersed Tunnel in Nanchang
下载PDF
导出
摘要 沉管隧道最终接头短管节在牵移和拉合过程中易发生偏移与倾斜,且GINA止水带压缩到设计值难度较大。以南昌红谷沉管隧道为例,从准备、牵移、拉合及后处理4个阶段介绍短管节对接拉合施工工艺。通过对底钢板打磨、涂抹黄油等,减小底部摩擦阻力。采用计算机控制液压同步提升系统、液压数据量测、钢端壳间距测量等措施,对短管节轴线及平面控制。实践表明:GINA止水带压缩量误差仅为+4 mm,短管节轴线及平面偏差均在可控范围内,短管节干坞内拉合对接操作可行、质量可靠。 Deviation and inclination are apt to occur to pulling and connecting of short segment of immersed tunnel in dry dock and it is difficult to compress the GINA sealing strip to design value.Construction technology for pulling and connecting of short segment of Honggu Immersed Tunnel is introduced in terms of preparing,pulling,connecting and post-processing.Countermeasures,grinding the base steel and butter spreading,are adopted to decrease the frictional resistance of segment bottom.The axis and plane accuracy of pulling and connecting of short segment are controlled by hydraulic lifting system controlled by computer,hydraulic DAQ and gap distance measurement of end steel shell.The practices show that the error of compression amount of GINA sealing strip is +4 mm;the axis and plane accuracy of pulling and connecting of short segment can meet relevant requirements.
作者 崔玉国 陈旺 CUI Yuguo CHEN Wang(Erchu Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)
出处 《隧道建设》 北大核心 2017年第6期735-741,共7页 Tunnel Construction
关键词 沉管隧道 最终接头 短管节 拉合对接 偏差控制 GINA止水带 压缩量 immersed tunnel final joint short segment segment pulling and connecting deviation control GINA sealing strip compression amount
  • 相关文献

参考文献7

二级参考文献43

共引文献85

同被引文献15

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部