期刊文献+

供水工程输水线路隧洞下穿地方公路、河谷段施工方案

Local Road and Valley Section of Water Under Tunnel in Construction Plan in Water Supply Project
下载PDF
导出
摘要 在工程建设中,难免与原有建筑物、河道等发生交叉,对原有建筑物及河道产生影响,影响其原有的使用功能。因此,在保证工程建设顺利开展的同时,还要保障原有建筑物的使用功能。此外,在隧洞穿地方公路、河谷段的施工中,要确保无不良地质;要对地方公路、河谷段的施工进行控制,根据实际施工情况选择合理的施工方法,促进供水工程的顺利实施。 In the engineering construction appears unavoidably cross with the original buildings, rivers, etc, the original building and the impact of the channel, affect the use of its original function. Therefore carried out in the engineering construction at the same time, to ensure the use function of the original building, in addition, the wear of local road, river valley in tunnel construction to ensure that no bad geology, the period of the construction control of local road, river valley, according to the actual construction situation to select the reasonable construction method, promote the smooth implementation of water supply engineering.
作者 赵恕轲
出处 《工程建设与设计》 2017年第13期193-194,197,共3页 Construction & Design for Engineering
关键词 供水工程 输水线路 隧洞下穿 施工方案 water supply project water supply routes ttmnel under wear construction plan
  • 相关文献

参考文献4

二级参考文献43

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部