摘要
本文在质量信息收集全面的基础上,引入活性系统,考虑组织环境与质量信息收集之间、同级信息收集与不同级信息收集之间的关系,基于项目递归分解角度,从单位工程、分部工程、分项工程、工序这一视角构建全面、系统的施工质量信息协同管理模型,实现施工质量管理的实时化与信息化。
This paper, on the basis of the comprehensive quality inlor^nation collection, introduces active system, considers the relationship betw-een the organization as well as organization environment, and considers the balance betw-een same level and different levels inside company. The project will be recursive decomposition in order to manage the construction quality onsite in a comprehensive, complete and systematic way from the aspects of process, the sub project, the division of engineering and unite project.
出处
《价值工程》
2017年第23期71-73,共3页
Value Engineering
关键词
活性系统
信息协同
数据仓库
精益建造
active system
information coordination
data warehouse
lean construction