期刊文献+

明挖地铁车站与风道接口结构设计问题探讨 被引量:7

Discussion on Structural Design of Connection Interface between Open-cut Metro Station and Ventilation Duct
下载PDF
导出
摘要 以明挖地铁车站与风道接口结构设计问题为研究对象,结合相关理论及实际工程设计经验,从结构布置、抗浮等角度展开分析与探讨。在此接口的结构设计中,应加强和优化变形缝的布置及接口处梁柱体系的设计,选择合理的设计参数,确保结构安全可靠;地下水位特别高的车站,应做好接口处主体结构局部抗浮验算,采取合理有效的抗浮措施,确保主体结构抗浮满足要求;同时,对预留接口的相关设计问题也进行了探讨。 The structural design of connection interface between open-cut metro station and ventilation duct is discussed and analyzed in terms of structural arrangement and anti-floating. The authors recommend that: 1) The arrangement of deformation seams and the design of beam-column system at connection interface should be strengthened and optimized and rational parameters should be adopted so as to guarantee the safety of the structure. 2) The anti-floating calculation and anti-floating measures should be strengthened for main structure at connection interface with high groundwater level.The relevant design of reserved interface are discussed as well.
出处 《隧道建设》 北大核心 2017年第A01期86-90,共5页 Tunnel Construction
关键词 明挖法 地铁车站 风道接口 结构布置 抗浮 变形缝 预留接口 open-cut method metro station tnterface of ventilation duct structural arrangement anti-floating deformation seam reserved interface
  • 相关文献

参考文献5

二级参考文献24

共引文献22

同被引文献45

引证文献7

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部