期刊文献+

基于AutoPIPE的海底悬空管线挖沟埋设应力分析 被引量:2

Stress Analysis about Post-trenching of Submarine Suspended Pipelines Based on AutoPIPE
下载PDF
导出
摘要 基于AutoPIPE软件考虑管土作用机制,以施加密集V-stop模拟海床,并通过改变V-stop位置模拟挖沟过程,悬空管道在治理过程中的应力表明,一次挖沟成型与多次挖沟成型之后的管道应力相同,但多次挖沟成型过程中的应力峰值明显低于一次挖沟成型,而避免了悬空管道在挖沟过程中可能发生的屈服破坏;海底悬空管道挖沟埋设过程中随着挖沟深度和管道温差的增加,管道应力、屈服位移呈现增大趋势。 The stress changes of submarine suspended pipeline in the governance process were calculated in AutoPIPE,exerting concentrated V-stop to simulate seabed,and simulate trenching by changing the V-stop position. The result indicate that first-trenching embedding has the same stress with post-trenching,but post-trenching treatment can obviously decrease the peak stress,avoiding damage to yield suspended pipeline that may occur in the process of trenching. The depth of pipe cover and temperature difference of submarine suspended pipeline will significantly increases pipe stress in the process of governance.
出处 《船海工程》 北大核心 2017年第4期182-185,190,共5页 Ship & Ocean Engineering
基金 中海油(中国)有限公司项目(S12TJPWX015)
关键词 海底悬空管道 挖沟埋设 AutoPIPE 应力分析 submarine suspended pipeline post-trenching treatment AutoPIPE stress analysis
  • 相关文献

参考文献5

二级参考文献21

  • 1闫福明.人字型挖沟在管道施工中的运用[J].油气田地面工程,2005,24(10):34-35. 被引量:1
  • 2孟凡生,徐爱民,李军.滩海海底管线悬空问题治理对策[J].中国海洋平台,2006,21(1):52-54. 被引量:17
  • 3艾志久,邓宝,赵欣,李旭志.基于VB平台的海底管线设计技术程序开发[J].石油矿场机械,2007,36(3):1-4. 被引量:4
  • 4.SY/T 4804-92.海底管道系统规范[S].中国石油标准化技术委员会,..
  • 5许正明译.海底管道设计分析及方法[M].海洋出版社(北京),1984..
  • 6DNV RP F105, free spanning pipelines. 2007.
  • 7DNV OS F101, submarine pipeline systems. 2005.
  • 8路继臣,冯林先,林向英,等.滩海石油工程技术[M].北京:石油工业出版社.2006.188-190.
  • 9赵峰.辽东湾北部地貌变迁对海底管道安全影响研究[A].渤海湾浅海油气田开发工程技术文集(第六集)[C].北京:石油工业出版社.2008.617-623.
  • 10PAULIN M, HUMBY D, COCKER J, et al. Trenching of Pipelines for Protection in Ice Environments. SPE Arctic and Extreme Environments Conference and Exhibition, SPE, 2011:1 -7.

共引文献46

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部