溶洞发育地区桩基础施工技术 被引量:6

Construction Technology of Pile Foundation in Karst Area
下载PDF
导出
摘要 广州白云国际机场综合交通枢纽项目所在场区溶(土)洞较为发育,对其地下工程的施工质量和安全影响较大。根据项目所在地的特殊地质情况和桩基布置的特殊性,从超前钻、溶洞处理、桩基施工等方面,介绍了广州白云国际机场扩建工程交通中心及停车楼项目中T2航站楼隧道新增桩施工技术以及相应的质量控制措施。 The integrated transportation hub project of Guangzhou Baiyun International Airport is located in the area where the dissolved soil cave is relatively developed,which has a great influence on the quality and safety of the underground construction.According to the special geological conditions and pile layout of the project location,from advanced drilling,cave treatment and pile foundation construction,this paper introduces the construction technology of the new pile transportation center of Guangzhou Baiyun International Airport expansion project and parking building project in the terminal No.2 tunnel,and the corresponding quality control measures.
出处 《施工技术》 CAS 北大核心 2017年第14期10-12,共3页 Construction Technology
基金 中国建筑第八工程局有限公司科技研发课题(2015-09)
关键词 基坑 隧道 溶洞 桩基础 勘察 施工技术 foundation excavation tunnels karst cave pile foundation survey construction
  • 相关文献

参考文献4

二级参考文献14

共引文献81

同被引文献44

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部