将20MW光伏发电系统工程项目条件及项目发展的需求作为基础,结合系统整体方案来给出具体的分块发电与集中并网工作模式。近年来,社会经济的不断发展,带动了许多行业的发展,而电力作为人们日常生产生活中不必可少的部分,正在悄然的改变着人们日常生活。文章以当前20MW光伏发电系统及电气一次设计工作开展的情况为基础,结合近年来的工作经验,提出具体的20MW光伏发电系统及电气一次设计工作方式。
On the hasis of the requirements of the 20 MW photovohaic power generation system project and the development of the project, combined with the overall system scheme ,specific block power generation and centralized grid connected working mode are given.In recent years,the continuous development of social economy has led to the development of many industries, and electricity, as a part of people's daily production and life,is quietly changing people's daily life.Based on the current situation of the 20 MW photovohaic power generation system and electrical design work, combined with the recent work experience, the paper put forward specific 20 MW photovoltaic power genermion system and electrical design work.
出处
《企业技术开发》
2017年第7期66-67,89,共3页
Technological Development of Enterprise
关键词
20MW
光伏发电
电力系统
电气设计
20 MW
Photovollaic power generation
Electric power system
electrical design