针对近几年用电负荷迅猛增长,当前运行方式下110 kV变电站与主网联络线存在供电不畅的情况,通过对系统潮流、稳定和供电可靠性的计算分析,对变电站分列运行方式的可行性进行了探讨。
In recent years, the rapid growth of electricity load, the current operation mode of substation and power grid 110kV Dapingzi tie line power supply card neck existence situation, through the calculation of power flow, stability and reliability of system analysis, the feasibility of separate operation mode of 110kV Dapingzi substation is discussed