期刊文献+

青岛北站临时限速转换方案的实现

Implementation of Temporary Speed Restriction Conversion Scheme in Qingdao North Station
下载PDF
导出
摘要 随着青荣城际、青连铁路等逐步引入青岛北站,存在既有线提速CTCS-2级区段和客专CTCS-2级区段交汇同站的情况。出现不同的临时限速设置处理方式。为此采取在青岛北站进行临时限速转换的措施,实现了既有线提速CTCS-2级区段和客专CTCS-2级区段临时限速处理的一致性,对类似工程的实施起到一定的借鉴作用。 Along with the gradual connection of Qingdao-Rongcheng inter-city railway and Qingdao-Lianyungang railway and other railway lines into Qingdao North station,the concourse of CTCS-2districts of speed-raising existing railway lines and the CTCS-2districts of passenger dedicated lines at the same station will appear.Therefore,the setting of temporary speed restriction conversion is adopted to ensure the consistency of temporary speed restriction for the CTCS-2district for speed-raising existing railway lines and passenger dedicated line,offering certain reference for similar projects in the future.
作者 邹少文
出处 《铁道通信信号》 2017年第8期32-34,共3页 Railway Signalling & Communication
关键词 列控 临时限速转换设置 既有线提速 客运专线 Train control system Setting of Temporary Speed Restriction Conversion Speed-up of existing railway Passenger dedicated line

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部