引汉济渭工程TBM卡机脱困技术 被引量:16

Technology Used to Help Stuck TBM Passing Through in Hanjiang-to-Weihe River Water Transfers Project
下载PDF
导出
摘要 介绍了引汉济渭秦岭输水隧洞岭北工程TBM穿越断层破碎带时刀盘和护盾被卡,采用小导洞结合反向大管棚施工技术帮助TBM完成脱困,以及在卡机处理过程中使用的超前地质探测方法和支护安全监测方法,对今后类似事故的处理具有一定的借鉴意义。 This paper introduced that in the Lingbei segment of Qinling water-conveyance tunnel of Hanjiang-to-Weihe River Water Transfers Project,when TBM passed through the fault fracture zone,the cutterhead and shield got stuck,and by combining small guide hole with reverse large pipe-shed construction technology,it helped TBM pass through this section. During the process of handling the problem that the machine was stuck,the advanced geological exploration method and supporting safety monitoring method were used,which could provide a certain reference for handling similar accidents in the future.
作者 薛永庆
出处 《铁道建筑技术》 2017年第8期106-110,共5页 Railway Construction Technology
基金 中国铁建股份有限公司科技研究开发计划项目(14-C27)
关键词 TBM 卡机 脱困 TBM got stuck passing through
  • 相关文献

参考文献11

二级参考文献61

共引文献99

同被引文献149

引证文献16

二级引证文献112

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部