为了找到适用于大采高综采工作面的防尘技术手段,以神东补连塔煤矿22306大采高工作面为例,提出了大采高综采工作面除尘技术的设计准则,并以此为基础,对大采高综采工作面防尘技术措施进行了设计改造。通过现场实测的方法对设计改造的防尘技术措施进行了验证,提出的大采高防尘技术设计准则有较强的实用性,设计的防尘技术措施能够有效治理大采高综采工作面的高浓度粉尘。
In order to find dust mitigation method for large mining height fully mechanized work face, taking 22306 work face of Bulianta Mine as example, proposed design standards for dust treatment at large mining height fully mechanized work face, and based on that, improved dust treatment measures. Modified method by in-situ test of dust control technology measures were veri- fied that the design standards for dust treatment at large mining height fully mechanized work face had practicability and the de signed dust treatment measures could effectively reduce high concentrated dust at large mining height fully work face.
出处
《中国煤炭》
北大核心
2017年第9期116-120,共5页
China Coal
基金
国家自然科学基金重点项目(U12612022)
关键词
大采高工作面
防尘技术
粉尘分布规律
除尘系统
large mining height work face, dust treatment technology, dust distribution law, dust removing system