期刊文献+

大采高综放工作面回采期间覆岩结构破断研究 被引量:5

Study on Fracture of Overlying Strata in Fully Mechanized Top Coal Caving Face with Large Mining Height
原文传递
导出
摘要 以大同某煤矿8107大采高综放工作面为研究背景,通过建立理论力学模型研究了回采过程中顶煤覆岩高位的"砌体梁"结构与低位的"悬臂梁"结构耦合形成的"砌体梁-悬臂梁"结构,以及合理的支架工作阻力。现场实测8107工作面正常回采以及来压时支架工作阻力分别为26 MPa和40 MPa,与理论计算结果较为吻合。说明8107工作面采用的ZF15000/27.5/42型四柱低位放顶煤支架能够满足生产需求。 Taking Datong Coal Mine 8107 working face with high mining height as the research background, through the establishment of theoretical mechanics model, the "voussoir beam and cantilever beam" structure formed by coupling high "voussoir beam" structure with low "cantilever beam" structure in process of mining top coal rock, and the reasonable working resistance of support is studied. The working resistance of 8107 working face under normal mining and the pressure was 26 MPa and 40 MPa, the results are more consistent with the theoretical calculation. It shows that the 8107 working face using ZF15000/27.5/d2 type four-column low-level coal caving support can meet the production needs.
作者 李鹏
出处 《煤矿安全》 北大核心 2017年第9期211-214,共4页 Safety in Coal Mines
关键词 特厚煤层 大采高综放 覆岩结构 支架工作阻力 砌体梁 悬臂梁 ultra thick seam fully-mechanized top coal caving with large mining height overburden structure support working resistance voussior beam cantilever beam
  • 相关文献

参考文献8

二级参考文献66

共引文献349

同被引文献41

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部