期刊文献+

弱粘结遇水软化顶板煤巷锚索支护技术 被引量:1

Deformation and Reinforcement Technology of Weak Bonding Compound Roof of Roadway Surrounding Rock
下载PDF
导出
摘要 为解决泊江海子煤矿首采面运输顺槽支护时弱粘结遇水软化顶板变形严重的问题,通过改变围岩的材料、强度等参数来模拟围岩遇水软化的条件,应用FLAC3D数值模拟软件对比分析了锚索长度、锚索布置方式对巷道围岩稳定性的影响,并提出了优化支护方案。工程实践表明:运输顺槽优化后支护效果优于原支护,为相似的巷道支护提供了经验。 To solve Bo Jiang Haizi initial mining of coal mine when surface transport gateway support weak bond in water softening roof deformation serious problem,through the change of the material, the strength of surrounding rock parameters to simulate the surrounding rock in the condition of water softening. Software FLAC^3D numerical simulation analysis of the impact on the stability of surrounding rock of roadway anchor length,anchor cable arrangement, and put forward the optimization of supporting scheme. Engineering practice shows that the transport gateway optimized supporting effect is better than the original support, and provides experience for the similar roadway support.
作者 李守好 陈苗虎 付宝杰 Li Shou-hao Chen Miao-hu Fu Bao-jie(Huai Mine West Mine Investment Management Co,Ltd,Eerduosi 017000 Shool of Energy and Security, The MOE Key Laboratory of Coalmine Safety and High Efficiency Mining, Anhui University of Science and Technology, Anhui Huainan 232001)
出处 《山东煤炭科技》 2017年第9期74-76,79,共4页 Shandong Coal Science and Technology
关键词 弱粘结 遇水软化 锚索支护 数值模拟 weakly caking water-expanding cable bolting numerical simulation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部