结合沪昆高铁贵州西段、沪昆高铁云南段和渝万高铁综合视频监控系统执行《中国铁路总公司关于发布设计时速200km及以上铁路区间线路视频监控设置有关补充标准的通知》(铁总建设[2016]18号)的工程实践经验,从综合视频监控系统视频采集点设置、视频采集点安装、系统后台设备配置和系统承载网等方面,对"铁总建设[2016]18号文"在高速铁路综合视频监控系统工程中的设计及实施方案进行研究探讨。
With the engineering practical experience of CHINA RAIL WA Y's Notice about Video Monitoring Relevant Supplementary Standards Applied in the Railway Sections and Lines with a Design Speed of 200+ Kilometers per Hour (CHINA RAIL WAY Construction [2016] No. 18 Document) executed in Guizhouxi section and Yunnan section of Shanghai-Kunming high-speed railway as well as Chongqing-Wanzhou highspeed railway integrated video monitoring system, the paper will make a study of the design and implementation scheme of high-speed railway integrated video monitoring system engineering adopted CHINA RAIL WAY Construction [2016] No. 18 Document in terms of integrated video monitoring system video capture point setting and installation, system background device configuration and system bearer network etc.
作者
纪伟
JI Wei(China Railway Eryuan Engineering Group Co Ltd, Chengdu Sichuan 610031, China)
出处
《中国铁路》
2017年第8期78-84,共7页
China Railway
关键词
综合视频监控系统
18号文
安防
视频采集点
摄像机
integrated video monitoring system
CHINA RAIL WAY Construction [ 2016] No. 18 Document
security
video capture point
video camera