期刊文献+

基于背斜构造条件下安太堡露天矿产能与排土方案优化 被引量:3

Optimization of production capacity and dumping scheme based on anticline structure in Antaibao Open-pit Coal Mine
下载PDF
导出
摘要 当前安太堡露天矿正处于背斜构造区,依赖延深露煤与大提升远距离排土维持生产,能耗高、效率低和效益差。针对该问题,结合地表与煤层覆存、可利用排土空间容量、延深条件等的分析,提出适合的产能标准并开展采矿和排土的优化,以期实现产能的合理提升。 According to Antaibao Open-pit Mine depending on deepening coal mining and upgrading long distance drainage to maintain production capacity, it results in high energy consumption, low efficiency and poor efficiency. Combining with the surface condition, coal seam storage, available drainage space, engineering delay and other conditions, the article puts forward the appropriate production standards to optimize the mining and drainage, in order to reasonably improve production capacity.
作者 贺昌斌 解廷堃 张加权 常永刚 李海潮 韩亮 曹新宇 杨秀 HE Changbin XIE Tingkun ZHANG Jiaquan CHANG Yonggang LI Haicha HAN Liang CAO Xiny YANG Xi(Antaibao Open-pit Mine, China Coal Pingshuo Group Co., Ltd., Shuozhou 036006, China Anjialing Open-pit Mine, China Coal Pingshuo Group Co., Ltd., Shuozhou 036000, China Changzhi Supervision Bureau, Shauxi Coal Mine Safety Supervision Bureau, Changrhi 046011, China)
出处 《露天采矿技术》 CAS 2017年第9期21-24,30,共5页 Opencast Mining Technology
关键词 露天煤矿 背斜构造 露天延深 排土容量 open-pit coal mine anticline structure open- pit extension dumping space
  • 相关文献

参考文献5

二级参考文献12

共引文献16

同被引文献15

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部