期刊文献+

喀斯特区两种石料填筑面板堆石坝的质量控制 被引量:1

Filling quality control of concrete faced rockfill dam with two kinds of stone materials in karst region
下载PDF
导出
摘要 单一石料填筑大坝对料场开采质量和储量要求较高,而两种不同石料分区填筑混凝土面板堆石坝的关键在于设计、施工等环节质量控制是否到位。介绍了在贵州省岩溶区用两种不同石料分区填筑面板堆石坝所取得的成功经验。从坝体填筑质量检测结果、坝体沉降和脱空观测、面板裂缝情况等方面分析了质量控制的相关要点,可为今后在喀斯特地区采用两种石料填筑混凝土面板堆石坝提供借鉴。 Concrete faced rockfill dam filling with one kind of stone material has higher requirement on the quality and reserves of quarry. The key problem of partitioned filling of concrete faced rockfill dam with two kinds of different stone materials is the quality control of design and construction. The successful experience of using two different stone materials to fill a concrete faced rockfill dam in karst region of Guizhou Province was introduced. The key points of quality control were analyzed from the aspects of dam quality check results, dam settlement, empty observation and slab cracks. The research can provide references for con-crete faced rockfill dam filling with two kinds of different stone materials in other karst region.
作者 丰启顺
出处 《人民长江》 北大核心 2017年第18期78-81,共4页 Yangtze River
关键词 分区填筑 面板堆石坝 填筑质量控制 喀斯特地区 partitioned filling concrete faced rockfill dam filling quality control karst region
  • 相关文献

参考文献5

共引文献14

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部