期刊文献+

高河煤矿E1302综放工作面平推过F_(1n)大断层技术研究 被引量:4

Gaohe Coal Mine E1302 Fully-mechanized Sublevel Caving Mining Working Face of Pushing through F_(1n) Fault Research Technology
下载PDF
导出
摘要 文章介绍了高河矿E1302综放工作面平推过F_(1n)(H=3.8 m)大断层的回采工艺和顶板管理,对F_(1n)断层进行了认真分析和论证,大胆创新,提出了"水平推进过断层"的技术方案,保证了工作面过断层期间的安全生产,取得了良好的经济效益,为以后工作面回采过大断层提供了一定的经验。 This paper introduces Gaohe E1302 fully-mechanized caving mine horizontal pushing through F_(1n)( H = 3. 8 m) extraction technology of large fault and roof management,the F_(1n)fault has carried on the earnest analysis,bold innovation,put forward the"horizontal push through fault" "technical plan,ensure the safety in production during working face through fault,has obtained the good economic benefit,for the mining face is too large fault provides certain experience.
出处 《煤》 2017年第10期13-15,共3页 Coal
关键词 过断层 抬高 留底煤 超前拉架 加固注浆 through fault raise purpose of coal leading pull frame grouting reinforcement
  • 相关文献

参考文献5

二级参考文献5

共引文献112

同被引文献17

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部