摘要
论文结合万都如皋商业广场北区设计,阐述在方案、施工图及施工图完成后如何进行立面控制,并结合三维模型在设计阶段尽可能提高设计作品的完成度。
Combined with the design of the north area of Wandu Rugao Commercial Plaza it describes how to control the elevation in the period of scheme and construction design and after the completion of construction design. Using the three-dimensional model in the design stage as far as possible to improve the completion of the design work.
作者
张晨曦
ZHANG Chen-xi(Wuxi CG.Design Co., Ltd, Wuxi Jiangsu 214000 China)
出处
《江苏建筑》
2017年第4期7-10,共4页
Jiangsu Construction
关键词
完成度
设计质量
立面控制
Wandu Rugao Commercial Plaza
elevation
scheme
construction design