摘要
以温州市苍南县龙港新城XC-1-29地块工程项目为例,对特殊工程地质条件下桩基施工产生问题进行分析,并采取相应的处理措施,以提高工程的质量、节约经济成本。
Taking new Longgang city XC-1-29 land engineering project of Cangnan county in Wenzhou city as an example,the paper analyzes pile foundation construction problems under special engineering geology conditions,and adopts corresponding processing measures,with a view to improve the engineering quality and save economic cost as well.
出处
《山西建筑》
2017年第26期77-79,共3页
Shanxi Architecture
关键词
特殊地质条件
桩位
偏移
special geological conditions, pile location, deviation