摘要
为能够按时按质量地完成舟山阿鲁亚大酒店的建设工程,就需加强施工各方的相互配合。但实际施工过程中,总是无可避免地会出现一系列的问题,如工期延误、工程接续、工程验收等问题。舟山阿鲁亚大酒店的工程在施工的过程中如果出现上述的3个问题,就会导致工程项目的进度和质量出现问题,影响有关单位的经济利益和社会效益,还会增加相关单位的矛盾等。因此,解决舟山阿鲁亚大酒店的工程在施工过程中的问题迫在眉睫。从舟山阿鲁亚大酒店工程在施工过程中遇到的工期延误、工程接续、工程验收等问题为着眼点,进一步对这些问题进行研究分析,并提出相应的对策。
In order to complete the project on time and according to quality aruya,Zhoushan Hotel,we need to strengthen the construction of the parties to cooperate with each other. However,in the actual construction process,it is inevitable that there will be a series of problems,such as the delay of the project,the project,the project acceptance and other issues. Zhoushan aruya,hotel project in the construction process if the above three problems,will lead to progress and project quality problems,affect the units of economic benefits and social benefits,but also increase the contradiction of related units etc.Therefore,to solve the problems in the construction process of Zhoushan aruya,hotel project imminent.This paper is mainly from the Zhoushan aruya,hotel project encountered in the construction process of time delay,engineering connection,project acceptance and other problems as the starting point,further research and analysis of these problems,and put forward the corresponding countermeasures.
出处
《建筑技术开发》
2017年第07X期69-70,共2页
Building Technology Development
关键词
工程建设
酒店施工问题
工程验收
engineering construction
hotel construction problems
project acceptance