摘要
结合施工实践,对纵横梁体系加正交异性桥面板结构的斜拉桥,在桥面板焊接和高强度螺栓施工过程中的先后顺序,控制要点分析、研究和总结。
In this paper, combined with the construction practice, the vertical and horizontal beam system plus orthotropic bridge deck structure of the cable-stayed bridge, bridge deck welding and high-strength bolts in the construction process of the order, control points analysis,research and summary.
出处
《建筑技术开发》
2017年第9期59-60,共2页
Building Technology Development
关键词
栓焊结合
桥梁
栓焊施工
bolt welding
bridge
bolt welding construction