摘要
现浇中隔墙已广泛应用于隧道工程中,但常面临着各种施工难题。依托青岛蓝色硅谷崂山隧道,深入分析现场工程地质情况及现有的施工技术水平,优选适合现场情况的施工方法,优化中隔墙的施工顺序,并成功应用于现场施工中,大幅提高施工质量和效率,可为同类工程提供技术参考。
Cast in place wall is widely used in tunnel engineering, but still often faced with a variety of construction problems. Relying on the Qingdao Blue Silicon Valley tunnel in Laoshan, indepth analysis of the geological conditions and existing engineering construction technical level and construction method of selection of suitable site conditions, construction sequence optimization of partition, and successfully applied to site construction, improve construction quality and efficiency, to provide technical support for the same type of engineering.
作者
路刚
刘永奎
贾丽红
LU Gang LIU Yong-kui JIA Li-hong(China Railway Fourteen Bureau Group Co., Ltd., 250014, Ji'nan, China)
出处
《建筑技术》
北大核心
2017年第11期1149-1152,共4页
Architecture Technology
关键词
现浇中隔墙
隧道工程
施工质量
cast in place partition wall
tunnel engineering
construction quality