摘要
由于在任务执行过程中,任务的完成与资源使用量、时间消耗量等有关,通常对耦合设计任务作分析的工作转移矩阵仅仅考虑时间一个标准过于单一,会导致不同种资源不共享而闲置造成浪费。考虑到以上问题,本文从资源均衡方法入手,对耦合设计任务进行分析,寻找一种合理的资源分配方法,提高资源的利用率。
Because the completion of tasks is related to resource usage, time consumption and so on in the process of task execution,only one standard of time is considered in the work transfer matrix which is usually used to analyze the coupling design tasks, which leads to different kinds of resources are not shared and cause waste. Considering the above problems, this article starts with the resource equalization method and analyzes the coupling design tasks to find a reasonable resource allocation method to improve resource utilization.
作者
祝威
ZHU Wei(School of Mechanical and Power Engineering, China Three Gorges University, Yichang 44300)
出处
《内燃机与配件》
2017年第24期17-18,共2页
Internal Combustion Engine & Parts
关键词
资源均衡
产品开发
耦合问题
工作转移矩阵
resource leveling
product development
coupling problem
work transformation matrix