摘要 在地质构造复杂、不同岩层交叉发育的地区,钻孔桩施工过程中极易遭遇斜岩面,造成钻头出现偏锤现象,从而需要反复修孔才能保证桩基垂直度,严重影响施工工期。针对依托工程中大直径嵌岩桩大倾角高强度斜岩面地质情况,提出了预爆破纠偏的新方法,有效解决了施工困难,提高了施工工效。 In the area of complex geological structure and cross-development of different rock formations, the inclined rock surface is easily encountered during the construction of bored pile, causing the drill hammer partial phenomenon, which requires repeated repair to ensure the vertical degree of the pile foundation, seriously affect the construction period. Based on a project in the large diameter rock-socketed pile inclination of high strength inclined borehole geological situation, we put forward a new method of pre -blasting rectification, which effectively solves the construction difficulties and improves the construction efficiency.
出处 《中国港湾建设》 2017年第11期17-20,共4页 China Harbour Engineering
关键词 大直径嵌岩桩 高强度 斜岩面 预爆破 large diameter rock-socketed piles high strength inclined rock surface pre-blasting
  • 相关文献

参考文献3

二级参考文献5

  • 1TB10210,铁路混凝土与砌体工程施工规范[S].
  • 2JTS257-2008,水运工程质量检验标准[S].
  • 3TZ213-2005,客运专线铁路桥涵工程施工技术指南[S].
  • 4JTS167-4-2012.港口工程桩基规范[S].
  • 5黄木荣.桥梁钻孔灌注桩施工经验总结[J].山西建筑,2009,35(15):99-100. 被引量:5

共引文献11

同被引文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部