期刊文献+

地铁盾构下穿高架对桥桩影响的数值分析 被引量:3

Numerical analysis of the effect to pile with shield tunnel crossing the viaduct
下载PDF
导出
摘要 基于合肥地铁盾构隧道穿越高架桥工程,用有限元软件MIDAS GTS/NX对开挖过程进行仿真模拟,分析了开挖过程对高架桩基的影响。结果表明:高架桥桩的位移总体上表现为距盾构区相同距离下的桥桩的位移值基本相同;距盾构区不同距离下的桥桩的位移变化表现形式基本相似,盾构隧道对高架桥的影响在安全限度范围内。 Based on the project of Hefei metro shield tunnel crossing the viaduct, the excavation process is simulated with the finite element software MIDAS GTS, and the effects of excavation process on elevated pile foundation are analyzed. The overall displacement of Viaduct Pile shows that the displacement under the same distance from the shield area of piles is basically the same; the displacement form from the shield area under different distances is basically the similar, and the influence of shield tunnel on the pile foundation is within the limit of safety.
作者 高东
出处 《湖南文理学院学报(自然科学版)》 CAS 2017年第4期68-71,共4页 Journal of Hunan University of Arts and Science(Science and Technology)
基金 安徽省教育厅教学研究重点项目(2015jyxm252)
关键词 隧道盾构 高架桥桩 位移 数值分析 tunnel shield viaduct pile displacement numerical analysis
  • 相关文献

参考文献9

二级参考文献87

共引文献934

同被引文献11

引证文献3

二级引证文献2

相关作者