基于行为效应的MRO服务中心多技能工调度优化 被引量:4

Multi Skilled Worker Scheduling Optimization of MRO Service Center Based on Behavior Effect
原文传递
导出
摘要 人力资源是MRO服务中心调度的重要因素。将多技能工调度与员工行为效应即学习和遗忘效应相结合,以最小化任务总完工时间为目标建立模型,并用分段染色体遗传算法进行求解。在模型中考虑多技能工掌握的技能和任务的技能需求相匹配,并考虑员工在一个任务点可以使用其掌握的多项技能。通过算例对模型进行分析,发现任务数量和员工数量对任务总完工时间和作业时间有影响,且考虑行为效应的指派能优化员工安排,缩短任务总完工时间。说明人的行为效应对企业实际利益有重要影响。 Human resource is an important factor in MRO service center scheduling. Combining the multi skilled worker scheduling with the learning effect and the forgetting effect, a model was established to minimize the make-span of the task. Segmented chromosome genetic algorithm was used to solve the problem. The model considered the match of employee's mastery of skills and task's skill requirements. Employees can use not only one skill in each task. It is found that the number of tasks and employees have an influence on the make-span and operation time, and the assignment considering the behavioral effect will optimize the staff arrangement and shorten the shift and waiting time. It shows that human behavior effect has a significant impact on the actual interests of enterprises.
出处 《工业工程与管理》 CSSCI 北大核心 2017年第6期85-91,106,共8页 Industrial Engineering and Management
基金 国家自然科学基金资助项目(71271138) 上海理工大学科技发展基金资助项目(16KJFZ028)
关键词 MRO 多技能工指派 行为效应 MRO multi skilled worker assignment behavioral effect
  • 相关文献

参考文献6

二级参考文献64

  • 1魏俊华,王安麟.基于分段遗传编码的配送路径优化[J].工业工程与管理,2005,10(4):85-88. 被引量:1
  • 2曾庆成,高宇.集装箱码头装卸桥调度优化模型与算法[J].计算机工程与应用,2006,42(32):217-219. 被引量:16
  • 3李昆鹏,马士华.供应链中生产和运输协调调度问题初探[J].工业工程与管理,2007,12(2):1-6. 被引量:6
  • 4Lira A,Rodrigues B,Xiao F,et al. Crane scheduling with spatial constraints[J]. Naval Research Logistics, 2004,51 (3) : 386-406.
  • 5KimK H, Park Y M. A crane scheduling method for port container terminals [J]. European Journal of Operational Research, 2004,156 (3) : 752-768.
  • 6Lira A, R Rodrigues B, Xu Z. A m-parallel crane scheduling problem with a non-crossing Constraint [J]. Naval Research Logistics 2007,54(2) : 115-127.
  • 7Goodchild A V,Daganzo C F. Crane double cycling in container ports: Planning methods and evalutaion [J].Transportation Research Part B, 2007,41 (8) : 875-891.
  • 8Lee D H,Wang H Q, Miao L X. Quay crane scheduling with non interference in port container terminals[J].Transportation Research Part E, 2008,44 (1) : 124-135.
  • 9Bierwirth C, Meisel F. A fast heuristic for quay crane scheduling with interference constraints[J]. Journal of Scheduling, 2009, 12:345-360.
  • 10柏孟卓,陈峰,唐国春.供应链管理中生产和运输集成的排序问题[J].工业工程与管理,2007,12(5):47-50. 被引量:16

共引文献42

同被引文献36

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部