摘要 大化水电站自建成投产以来,由于库区漂浮物较多,每年汛期库区被洪水夹带的农作物废弃物、树根、竹枝等大量堆积在进水口前,由于清污设施不够完善,无法及时对污物进行清除,多次造成树根、杂物卡阻水电站机组导叶的事故。该文对产生的原因和危害性进行了分析探讨并提出了应对措施,从而有效地提高了水电站运行安全可靠性和电厂经济效益。 Since Dahua Hydropower Station was put into operation a large number of crop wastes roots and bamboo havebeen accumulated in front of the reservoir inlet during annual flood season because of more floaters in the reservoir area. Thesewage can not be removed in time due to the insufficient sewage disposal facilities which blocks guide blade of unit in thehydropower station. This paper analyzes the cause and harmfulness and puts forward countermeasures so as to effectivelyimprove operation safety and reliability as well as economic benefits of the hydropower station.
作者 程新年
出处 《红水河》 2017年第6期101-104,共4页 Hongshui River
关键词 机组 导叶 卡阻 大化水电站 unit guide blade blockage Dahua Hydropower Station
  • 相关文献

参考文献2

二级参考文献4

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部