文中选择河北省某采石场为研究对象,采用徕卡C10获取三期激光点云数据,利用Cyclone完成数据的预处理。在Cyclone软件中建立TIN模型的基础上,获取三期数据的挖方量,依据挖方量计算出相邻二期的开采量。研究结果表明:该技术方法可行,能够满足管理部门的需要。
In the paper,a quarry was selected as the object of study in Hebei Province,and the three phase laser point cloud data was obtained using Leica C10,and the data pretreatment was completed using Cyclone. Based on TIN model in Cyclone software,excavated volume of three data was obtained,the amount of excavation mining quantity of adjacent second period was calculated in accordance with the excavated volume. The results showed that the method was feasible and could meet the needs of the management department.
出处
《矿山测量》
2017年第6期15-18,共4页
Mine Surveying
基金
江苏省海洋科学技术优势学科建设项目
海岛(礁)测绘技术国家测绘地理信息局重点实验室资助项目(2014B09)
黑龙江省教育厅资助项目(12541675)