期刊文献+

患者CT/MR检查流程中品管圈的应用 被引量:1

Patients With CT/MR Images in The Process The Application of Quality Control Circle
下载PDF
导出
摘要 目的:探讨品管圈活动在放射科CT/MR检查中缩短等待时间的应用。方法:选取2015年9月未开展品管圈活动前CT、MR检查患者400例作为对照组,2015年12月开展品管圈活动后CT、MR检查患者400例作为试验组。将两组患者各自的检查等待时间进行比较。结果:经过品管圈活动实施,患者检查平均等候时间明显少于实施前。结论:品管圈活动的实施可有效缩短患者检查等待时间,优化检查流程,候诊环境安静有序。 Objective: To explore the application of quality control circle activity in shortening the waiting time of CT/MR examination in radiology department. Methods: 400 cases were selected as control group before CT and MR were ex- amined in September 2015, and 400 cases of patients with CT and MR after December 2015 were selected as control group. The waiting time was compared between the two groups of patients. Results: the average waiting time of the patients was sig- nificantly less than that before the implementation of the quality control circle. Conclusion: the implementation of QCC can effectively shorten the patient waiting time, optimize the inspection process, the waiting environment quiet and orderly.
出处 《现代医用影像学》 2017年第5期1185-1186,1189,共3页 Modern Medical Imageology
基金 广东省自然科学基金项目2015A030313753) 广州市科学研究专项(201510010002) 广东省卫计委适宜技术推广项目(粤卫通2015(7)) 广州市番禺区科技计划项目(2014-Z03-24)
关键词 品管圈 CT MR检查 等待时间 流程优化 Quality Control Circle CT and MR Images Wait for Time. Process Optimization
  • 相关文献

参考文献6

二级参考文献32

共引文献37

同被引文献2

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部