煤矿巷道机械化掘进工艺的优化 被引量:6

Optimization of mechanized excavation process of coal mine roadway
下载PDF
导出
摘要 由于巷道的地质情况复杂多样,在进行掘进作业的过程中存在着较大的困难,掘进施工工艺的优化程度直接影响到工程的质量。随着科技的进步,掘进工作面融入了更多的人机交互元素而变得更为复杂,这对于掘进施工的安全性和稳定性有了更高的需求。文章针对当前的煤矿巷道掘进工艺进行了探讨分析,提出了技术和施工组织方面的优化内容。 Due to the complex geological conditions of the roadway,there are great difficulties in the tunneling process,and the optimization of the tunneling process will directly affect the engineering quality. With the continuous progress of science and technology,the tunneling work is getting more and more complicated due to the integration of more human-computer interaction elements,which requests a higher demand of the safety and stability of tunneling construction. Aiming at the current mine roadway driving technology,the optimization method of technology and construction organization was put forward.
作者 刘琪 赵明
出处 《陕西煤炭》 2017年第4期127-128,103,共3页 Shaanxi Coal
关键词 巷道 掘进作业 工艺工序 优化 roadway excavating operation process optimization
  • 相关文献

同被引文献16

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部