论入世后工程风险管理制度的建立 被引量:3

On The Establishment of Engineering Risk Management System after China Joining into WTO
下载PDF
导出
摘要 工程风险管理的转移措施主要是两个途径 :一是工程保险 ;二是工程保证担保。加强对工程保险及工程保证担保的研究 ,尽快建立工程保险和工程保证担保制度 ,这对建立具有中国特色的工程风险管理制度、提高我国建筑企业的风险管理水平有着积极的作用。结合我国建筑业的发展现状 。 Two major means of transferring measures in engineering risk management are engineering insurance and engineering guarantee warrantee. To deepen the study, and thus to quicken the establishment of engineering insurance and engineering guarantee warrantee is of great importance in establishing China's own engineering risk management system and improving China's risk management level. Based upon current situation in China's architecture, some effective measures are prompted to establish and popularize engineering insurance and engineering guarantee warrantee system in China as China enters into WTO.
作者 王进 刘武成
出处 《基建优化》 2002年第4期11-14,共4页 Optimization of Capital Construction
关键词 风险管理制度 建设工程 WTO engineering risk management insurance guarantee warrantee WTO
  • 相关文献

参考文献5

二级参考文献1

  • 1梁秀伶.国际保险实力[M].天津科技翻译出版公司,1995..

共引文献15

同被引文献6

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部