地铁车站与不同盾构型式区间衔接方案及站型研究 被引量:1

Study on station layout and connection scheme of metro station and different shield tunneling sections
下载PDF
导出
摘要 宁波市轨道交通2号线二期招宝山站前后2个区间分别采用圆形盾构和类矩形盾构施工,然而目前对于与类矩形盾构隧道衔接的车站型式研究较少。文章基于招宝山站两侧采用不同的盾构型式,研究提出地铁车站与不同盾构型式区间衔接方案及车站型式。 Two sections before and after Zhaobaoshan station uses circular shield and rectangular-shaped shield in the tunneling construction as the Phase I1 of Ningbo metro line 2. However, at present there are few studies on the design of the station to be connected to similar rectangular-shaped shield tunnel. This paper studies and puts forward connection scheme and metro station layout with diftrent shield sections based on the different shield types used at both sides of Zhaobaoshan station.
出处 《现代城市轨道交通》 2018年第2期38-41,共4页 Modern Urban Transit
关键词 地铁 车站 隧道 车站站型 盾构型式 车站区间衔接 metro tunnel, station layout, shield type, connection of station and section
  • 相关文献

参考文献1

二级参考文献2

共引文献25

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部