摘要
珠海的横琴岛位于珠海市陆域东南部,珠江出海口西侧,总面积106.46 km2。横琴岛上有两大山体,南侧为大横琴山,北侧为小横琴山。大、小横琴两山之间为中心沟片区,小横琴山以北为北片区。中心沟片区及北片区是横琴岛可开发建设的主要用地。以中心沟北区防洪工程为例,包括10条排洪渠以及上村、下村、向阳村3座排涝泵闸,主要对下村泵闸的软基处理方案做详细分析。
Zhuhai Hengqin Island is located in the southeastern part of Zhuhai city, the west side of the Pearl river estuary, with a total area of 106.46km2. Hengqin Island has two mountains, the south side of the large Hengqin Hill, the north side of the small Hengqin Hill. Large and small Hengqin between the two mountains for the central area, small Hengqin north of the North Area. Center ditch area and the North Area is Hengqin Island development and construction of the main land. The project is the center of the North River flood control project, including 10 drainage channels and the village, under the village, Xiangyang village, three drainage pump gate. This article mainly elaborates the soft foundation treatment scheme of the lower village pump.
出处
《建筑技术开发》
2018年第2期118-119,共2页
Building Technology Development
关键词
水泥搅拌桩
复合地基
预应力管桩:地基处理
cement mixing pile : composite foundation
prestressed pipe pile : foundation treatment