期刊文献+

顶管近距离上跨运营隧道施工变形实测结果分析 被引量:6

Analysis of Measured Results of Tunnel Deformation Induced by Pipe Jacking Construction
下载PDF
导出
摘要 通过对深圳某大断面顶管近距离上跨运营地铁盾构隧道施工过程引起顶管下部盾构隧道不同监测断面竖向变形实测值进行研究分析,同时结合施工过程中采取的变形控制措施进行了分析。对浅覆土大断面顶管顶进过程中地表变形规律及控制措施进行了研究,发现浅埋大断面顶管施工会引起下部盾构隧道产生隆起变形,变形主要集中在顶管施工区域约3倍顶管宽度范围内。顶管外注浆及管内配重对控制隆起变形快速发展有较好的作用。 The field measured data of shield tunnel of Shenzhen metro under the pipe jacking during the pipe jacking construction was analyzed in this paper. And the deformation control methods of existing tunnel were also studied. The deformation law of shield tunnel induced by pipe jacking construction which lied up the shield tunnel was studied in particular. It was found that the shield tunnel uplifted in a region of 3 times of the width of pipe jacking induced by the construction. Mud grouting and loading can be used to control the rapid increasing of uplift deformation of shield tunnel.
出处 《公路工程》 北大核心 2018年第1期175-180,共6页 Highway Engineering
基金 台州市科技计划项目(162gy55) 浙江省大学生科技创新活动计划(2017R462004 2016R462006)
关键词 顶管施工 近距离 盾构隧道 变形控制 pipe jacking construction small distance TBM tunnel deformation control
  • 相关文献

参考文献10

二级参考文献87

共引文献442

同被引文献47

引证文献6

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部