南宁华润中心东写字楼项目施工总平面管理 被引量:1

Construction General Plan Management of East Office Building in Nanning Huarun Center
下载PDF
导出
摘要 超高层总平面管理一直是管理的一个难题,因为超高层建筑一般位于闹市区,且场地狭小,材料堆场规划较难,难以完全满足施工进度的要求,从而出现分包单位之间为堆场而争夺的情况,既浪费了时间,又形成恶性循环,最终影响现场的施工进度。本文主要阐述一种机动式堆场的介绍和实施。 It is difficult for general plan management of super high-rise building because the building often locates in down town with narrow site. The plan of material storage yard is difficult to completely satisfy requirement of construction proceed,so contest of storage yard occurred in each subcontract unit which not only waste time but also form a vicious circle aggravating. Finally construction proceed on site was influenced. This article mainly show a kind of mobile storage yard.
出处 《施工技术》 CAS 2018年第4期18-20,55,共4页 Construction Technology
关键词 高层建筑 总平面 管理 机动式堆场 考核 tall buildings general plan management mobile storage yard checking
  • 相关文献

参考文献4

二级参考文献8

共引文献23

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部