4Kermani M B,Morshed A. Carbon dioxide corrosion in oil and gas production-a compendium[J].{H}CORROSION,2003,(08):659-683.
5Song F M. A comprehensive model for predicting CO2 corrosion rate in oil and gas production and transportation systems[J].{H}Electrochimica Acta,2010,(03):689-700.
6Spence M A,Roscoe C V. Bi-metal CRA-lined pipe employed for north sea field development[J].{H}Oil and Gas Journal,1999,(18):80-88.
7Chen W C,Petersen C W. Corrosion performance of welded CRA-lined pipes for flow lines[J].SPE Production Engineering,1992,(04):375-378.
8Torbati A M,Miranda R M,Quintino L. Optimization procedures for GMAW of bimetal pipes[J].{H}Journal of Materials Processing Technology,2011,(06):1112-1116.